Reid Street project update
Crews completed the pulverization of Phase II on June 21. They are now excavating and preparing for pipe installation. A water leak was discovered in Phase II when crews were excavating. City crews were able to temporarily stop the leak which will be replaced with the new water main and water supply connections.
In Phase I, all of the street light bases have been installed and crews are preparing for curb works.
Take a look at our parking map to see free public parking options. Phase II Parking map