Construction Update:
Concrete is continually being poured for the structural columns, shear walls, and the suspended concrete slab for the second floor above the front lobby (shown above).
Fundraising:
The Seat Sale and Mural Sale continue. If you haven’t sponsored a seat or made a donation to the project, contact Alex by email at: arenaproject@quesnel.ca.